You should just about scrape that . LolOnly had half a bag of dot leftView attachment 43989
Don't you fill between the boards solid?Only had half a bag of dot leftView attachment 43989
Only had half a bag lol.Don't you fill between the boards solid?
And i still had 3 boards to put onOnly had half a bag lol.
get another course of bricks behind them boardsOnly had half a bag of dot leftView attachment 43989
I dont think John's bothered about solid perimeters tbh . Ha haDon't you fill between the boards solid?
Its only being fully tiledI dont think John's bothered about solid perimeters tbh . Ha ha
What's that got to do with it?Its only being fully tiled
Hes ran out of dabWhat's that got to do with it?
Why such a big gap behind the boards John?
Haha knew fatha would know theres a reason.What's that got to do with it?
Why such a big gap behind the boards John?
I'm assuming that your labourer didn't get out of the way quickly enough and is stuck behind them?Haha knew fatha would know theres a reason.
Cause i.m rough lol
Got joiner now saying i can just dot the yellow backed insulation boards on to solid wall with a few fixings inI'm assuming that your labourer didn't get out of the way quickly enough and is stuck behind them?
You can with them big mushroom fixingsGot joiner now saying i can just dot the yellow backed insulation boards on to solid wall with a few fixings in
Even on to solid wallsIf there the same ones we used on an industrial unit ??
explains why only half bag leftWhat's that got to do with it?
Why such a big gap behind the boards John?
Blames everything on tha lad!I'm assuming that your labourer didn't get out of the way quickly enough and is stuck behind them?
What else do i employ him forBlames everything on tha lad!
Don't you scratch coat old brickwork before dabbing I always do or am I wasting time.?You should just about scrape that . Lol
Sorry that not for you.Don't you scratch coat old brickwork before dabbing I always do or am I wasting time.?
Brush dust then wet it downDon't you scratch coat old brickwork before dabbing I always do or am I wasting time.?
What about cold spot?Brush dust then wet it down
b*ll***s do ya! LolBrush dust then wet it down
Like you said in last post 18 20 can flip a room over in no time rough like youBrush dust then wet it down
b*ll***s do ya! Lol
Ffs f**k**g gap behind the boards!
You're wasting your time. Especially if it's to prevent cold spots.Don't you scratch coat old brickwork before dabbing I always do or am I wasting time.?
Thats interior wallWhat about cold spot?