smoother09
Well-Known Member
Bet @algeeman can cover at least 6 with one bag so thats wrong!1 bag covers 3 and a half sheets of board for a first coat?
Bet @algeeman can cover at least 6 with one bag so thats wrong!1 bag covers 3 and a half sheets of board for a first coat?
Happy New year broGood evening Jamie xx
Good evening ChrisGood evening Jamie xx
Happy new year Jamie you mad b*****dHappy New year bro
Maybe read again? ..How do you work that out out its roughly 5 bags to scratch a 50m on then 2.5 bags to lay in?
Is that the best you can come back with? It’s your lack of input that’s the problem.Cheers for the input x
All the best compadreHappy new year Jamie you mad b*****d
I paint it on then finish with one of those supermediflexispeedskimspat jobbies just come out yacan only get um on dark Web!Bet I do
He read it right. He just genuinely thinks it takes more than 7 bags for a 50 meter ceilingMaybe read again? ..
3 bags first coat, then bag and half to lay down..?
pay peanuts get monkeys..
Can you not offer something positive? All you do is jump on someone else’s post and be a contrary c**t to everything?He read it right. He just genuinely thinks it takes more than 7 bags for a 50 meter ceiling
Does it take 7 bags to skim a 50sqm ceiling onto plasterboard then? Takes 5 at most doesn't it, so I've added something correct on plasteringCan you not offer something positive? All you do is jump on someone else’s post and be a contrary c**t to everything?
You heard wrong smoothie it's stewie 29sqmThey all u stewie 49sqm on site so I heard!
Probably a s**t rate and they were cutting corners to try and make a decent wage.Or he was paying good money and they were cowboys.Every story and situation is different.Still no answer to how much he was paying a metre
Probably a s**t rate and they were cutting corners to try and make a decent wage.Or he was paying good money and they were cowboys.Every story and situation is different.
You are never incorrect, we all know that.Can't remember you ever seeing my plastering, but cheers for the input. Feel free to point to the incorrect parts of my comment if you wish.
I can't believe 4 other plasterers agreed that it takes 7.5 bags of Multi to skim a 50sqm ceilingHow do you work that out out its roughly 5 bags to scratch a 50m on then 2.5 bags to lay in?
He read it right. He just genuinely thinks it takes more than 7 bags for a 50
DickI can't believe 4 other plasterers agreed that it takes 7.5 bags of Multi to skim a 50sqm ceiling
Rough 1 coating c**tDick
2 coat everything. Just not 5mm thickRough 1 coating c**t
Come work with me for a day and I'll teach you how to 2 coat bell cheese2 coat everything. Just not 5mm thick
Do you actually use 7. 5 bags for 50m?Rough 1 coating c**t
Why you joining in nob headDo you actually use 7. 5 bags for 50m?
I 2 coat and would probably use 4 on that...
Talk me through how you 2 coat a 50m ceiling with 4 bags you cockDo you actually use 7. 5 bags for 50m?
I 2 coat and would probably use 4 on that...
? Why be like that, was just asking if that's what you use?Why you joining in nob head
Look on the bag.. one bag does 10m, thats 2 coating it..Talk me through how you 2 coat a 50m ceiling with 4 bags you cock
Not all the time depends what im going over boards or bonding agent i didnt really speculate on wht really just fukin nob head nath jumped on it it like always? Why be like that, was just asking if that's what you use?
And as if you could one coat a 50m ceiling...?Look on the bag.. one bag does 10m, thats 2 coating it..
50m = 5 bags.
But I find can do more than bag states...
Maybe its just me...?
Well fair enoughLook on the bag.. one bag does 10m, thats 2 coating it..
50m = 5 bags.
But I find can do more than bag states...
Maybe its just me...?
ExactlyAnd as if you could one coat a 50m ceiling...?
Don't start calling me a nob head then...Exactly