Hi,
I have recently built a large raised flower bed and stop beeded all the way around.
My concerns are that if I k rend all the way to the bottom of the flower bed (artificial grass level) then I will be bridging my damp course.
I have lined the inside of the beds with a membrane to near the top on either side and left the bottom with weep holes in.
My questions are :-
Can I k rend straight to the bottom or do I need to install bellcast beads on the same level as my damp course.
I have attached a couple of pics for viewing
I have recently built a large raised flower bed and stop beeded all the way around.
My concerns are that if I k rend all the way to the bottom of the flower bed (artificial grass level) then I will be bridging my damp course.
I have lined the inside of the beds with a membrane to near the top on either side and left the bottom with weep holes in.
My questions are :-
Can I k rend straight to the bottom or do I need to install bellcast beads on the same level as my damp course.
I have attached a couple of pics for viewing