Tinytom
Well-Known Member
So this year Iv had a few fairly awkward jobs, Celings that roll down on all 4 sides, bull nose bay windows that sort of thing, iv always started laying on the difficult areas first then banged the rest on once I’m happy there near enough, thinking about it though next time I get 1 I’m going to work the other way round so lay the easy part on first then finish on the awkward bits to give myself more time to work them in before I’m due a flatten. Anyone else work this way? What’s your preferred method of laying on?
Iv also always laid on from top to bottom of walls just because that’s the way i was taught and always have since but I fancy a change next year I may throw caution to the wind and lay on from bottom to top.
Can you tell I’m bored and ready to go back? Lol
Iv also always laid on from top to bottom of walls just because that’s the way i was taught and always have since but I fancy a change next year I may throw caution to the wind and lay on from bottom to top.
Can you tell I’m bored and ready to go back? Lol