Hi all. I have had problems with render and plaster setting too fast - by the time I've reached the bottom of the wall the top's set too hard to float off. NHL 3.5/sand at 1:2, wall well wetted beforehand, render mixed for 15 mins before using. Also had this with internal plaster mix with NHL 2 and fine sand 1:1.
Render in 3 coats on rubble stone wall (dubbed out) - harl coat 2:1, float coat 2.5:1, finish coat 2:1.
Any ideas what I'm doing wrong? Thanks.
Render in 3 coats on rubble stone wall (dubbed out) - harl coat 2:1, float coat 2.5:1, finish coat 2:1.
Any ideas what I'm doing wrong? Thanks.