mikeadams1985
Private Member
I priced a job about 7months ago. For. Various bits of cornice repairs and moulds to match. Was only about 700 quid . Price agreed and a date booked in about 3-4weeks away. About a week before the date I informed him I needed his deposit before I made anything. Received the deposit few days later so I made the cornice about 2 days workshop work.
Day before he rings to say plasterer has let him down and jobs not ready. OK so He'll call me in a week when it's ready And we'll arrange another date. Rings me a week later plasterer still not sorted job. Roll on to today. He rings jobs ready.
Trouble is.. The stuff I made has been thrown away now.
So. If I do the job it's another 2 days of making stuff. I'll end up out of pocket.
Do I tell him to sling it?
Or explain he has lost his deposit and has to repay the whole lot.?
Day before he rings to say plasterer has let him down and jobs not ready. OK so He'll call me in a week when it's ready And we'll arrange another date. Rings me a week later plasterer still not sorted job. Roll on to today. He rings jobs ready.
Trouble is.. The stuff I made has been thrown away now.
So. If I do the job it's another 2 days of making stuff. I'll end up out of pocket.
Do I tell him to sling it?
Or explain he has lost his deposit and has to repay the whole lot.?