10 long years of it ....
Having 3 daughters to pay for haha.
I used to 2 coat many moons ago.. now only on floating or domestics.
After 5pm f**k thatAfter 5pm
If am one coating the boarding has to be good which it is most of the time.I used to do that but don't do it anymore, I also used to get my first coat on and then second coat straight on top and flatten in first coat as I went along second coating, if that makes sense? Now I first coat, flatten, second coat flatten etc.
You said in another thread the boarding you work on is shiteIf am one coating the boarding has to be good which it is most of the time.
I mix up and fill the long joints then I lay on a good 3mm coat as flat as I can even if it takes a few minutes longer because it hangs for a while.
Then after it has pulled in a touch I sponge it without adding water then trowel followed by second trowel then a dry polish.
But timing can change depending on the boards and weather
3 two bag hits or 2 X 3 bag followed with a two bagHow many sets you doing a day ffs
After 5pm f**k that
That was meant for algee should have quoted him3 two bag hits or 2 X 3 bag followed with a two bag
Depends on area and room size
Would rather do two large hits the prep for next day