Hi All,
This is probably a very basic question to most of you, but i am going to plaster a doorway. I have boarded it over and sit about 4 mm below the existing plaster. i dont want to try and do the whole wall, but i do want to make sure the joins from the new plaster to the old plaster are good. Could you please give me a few pointers.
many thanks
tryer
This is probably a very basic question to most of you, but i am going to plaster a doorway. I have boarded it over and sit about 4 mm below the existing plaster. i dont want to try and do the whole wall, but i do want to make sure the joins from the new plaster to the old plaster are good. Could you please give me a few pointers.
many thanks
tryer