It's taken me months of my spare time to remove all of the old plaster from the stairway, and now its time to start plastering each of the different surfaces.
The first is an internal wall made of chalk 'breeze blocks' that have straw cast inside.
The wall is really uneven, so I was going to try and level it first with bonding.
Should I pva (ratio?) the night before, then pva again on the day (ratio?) and use bonding on the low spots?
Then a few days later do the same 2 pva again over the whole lot before multifinish?