I am rendering a chimney before the slates go onto the roof. The lead is on, but the lead that goes under the outer lead flashing has to be done yet after the slates go on. Am i leaving the stop bead to low as when he lifts the lead to put the under flashing on it might crack the plaster.
Photo attached
Photo attached