I recently priced a reverb job for some builders I work for from plans (conversion of offices to flats) and was told all new plasterboard and 2.4m height. Quote was accepted.
Poked my head in today and ceiling height is 2.8 and all existing brick walls are to be made good and skimmed. I am pushing for these to be boarded too (someone else is boarding it) as they are currently a mess with chases, cut outs, and loose lime render etc.
Would I be best to requote the works because of the extra height or would you just add a percentage on top?