I re-skimmed a toilet the this week. First day was stripping loose paint and skimming the ceiling, the next was two opposite walls in the morning, and the other in the afternoon. The problem I had was the one of the walls in the afternoon was the exterior wall and it took ages to go off compared to the other wall I did at the same time. So the interior wall was ready for its second coat, but the exterior wall was way behind even though I put it on first (obviously because it was a lot colder).
I was wondering what people would do in this situation?
Thanks in advance.