Bonjour everyone , gotta bit of a problem so thought I ask a few old heads some advice lol:RpS_biggrin: I'm doing a bit of internal rendering , going over someone else's work ( i know cardinal sin ) but he's a m8 so couldn't leave him hanging . Basically some odd jober whacked a scratch coat on a stairwell wall, now I gotta dub this wall out a fair bit , and I mean a fair bit , to get it anywhere near flat ,I chucked on 2 coats yesterday (quite thick to b honest) 4-1 mix with freeflo ad mix , came back I next day and the render ain't set , its still a bit soft , not wet but not gone off I u know wat I mean , I can push my finger in and I leaves a dent . Now its quite cold in the house because its a shell , and the sand was a bit wet from the poxy weather . Now have all these factors just caused a really slow setting time its still the same now , its BN over 24 hours or should I start panicking lol