I have recently purchased a new build house and i'm just after a little advice about the rendering.
The top floor is rendered and the ground is exposed brickwork. where the render meets the the brick on the horizontal plane. they appear to have used what i believe are called stop beads.
I don't know if it is all in my head but i swear the mortar just below this point is retaining water and i can't see anything to stop water tracking into the brickwork/cavity.
Am i overthinking it or should they have used a drip bead?
See pic attached.
The top floor is rendered and the ground is exposed brickwork. where the render meets the the brick on the horizontal plane. they appear to have used what i believe are called stop beads.
I don't know if it is all in my head but i swear the mortar just below this point is retaining water and i can't see anything to stop water tracking into the brickwork/cavity.
Am i overthinking it or should they have used a drip bead?
See pic attached.