User___removed
Well-Known Member
We are spraying k rend gp mortar at the minute at 8 bar on 20mts of hose!!!1bar per 1m of hose thats the best guide for consistency so 25mts hose 25 bar gear is right
The gear really needs to be like piss for the first pass directly onto the blockwork
Any stiffer and I can't keep up on the rule
We don't bother with the guide that's advised as the gear is unworkable!!!