There's shout 1000,000,000 m2 mare in a jumbo bag..glad to helpI have done internal rendering, but the 'plastering' sand was full of small stones. PITA but it went on and the finished job turned out OK.
BTW I cannot do the numbers (would love to see your workings out lol), but assumed most professionals here would know roughly how many m2 per jumbo bag.
@5mm40m a bag
Think you will blow his head with thisWell I suppose you could think of it as a 1m cube, that's 1m2 every millimetre and divide by the thickness of your render, andz Bob's!, you got how many m2!
then allow for wastage, and voids, and moisture content, s' easy
A jumbo bag is 850 kg to make it 4&1 you need around 200 kg of cement So 1000 kg,@5mm
.75m cube just to make it easy….Well I suppose you could think of it as a 1m cube, that's 1m2 every millimetre and divide by the thickness of your render, andz Bob's!, you got how many m2!
then allow for wastage, and voids, and moisture content, s' easy
Most jumbo bags are 800kg.A jumbo bag is 850 kg to make it 4&1 you need around 200 kg of cement So 1000 kg,
25 kg a metre at 15 mm, mate 40 meters to a ton
I’m doing it every dayMost jumbo bags are 800kg.
Trust me you won’t get 40m2 of S&C @15mm out of a bulk bag mate.
Thanks for the helpful replies.
I only wanted a rough idea, so as to not over/under order.
I just assumed you professionals would need to know the basics of this to do your job.
Anyway, I asked someone as clever as you lot and he said the bag is a m3.
So each '15mm slice' would be a m2.
There are roughly 66 X '15mm slices' in a metre, so it would cover an area 66m2.
mmmmm, but that's a lot more than Tramps calculation and Cockney1 poo poo'd that!!!
JUST SAW TRAMPS POST ABOVE. THANKS M8. A PROFESSIONAL AT LAST
Do you do much S&C mate?I’m doing it every day
Every renderer is taught this.
25 kg of raw material =
@5mm, 3m2
@10mm, 1.5m2
@15mm, 1m2
and so on, The only thing I can think off is cockney bricklayers must be rough as f**k
I worked with a joiner called jimbo onceMost merchants stock jumbo bags, but better off with a jimbo bag tbf.
Uh huh, someone who you think is clever but knows FA about actually doing the job. There are umpteen fckn uk web easy answers if you goggle it, so why bother coming on here and bothering folk?Anyway, I asked someone as clever as you lot ...
We had an account with tarmac, sand direct from the quarry back in the day,Do you do much S&C mate?
Render or mortar strengths are worked out by volume, not by weight.A jumbo bag is 850 kg to make it 4&1 you need around 200 kg of cement So 1000 kg,
25 kg a metre at 15 mm, mate 40 meters to a ton
I'd like to know which merchant you use that a m3 of sand in their bulk bags?Thanks for the helpful replies.
I only wanted a rough idea, so as to not over/under order.
I just assumed you professionals would need to know the basics of this to do your job.
Anyway, I asked someone as clever as you lot and he said the bag is a m3.
So each '15mm slice' would be a m2.
There are roughly 66 X '15mm slices' in a metre, so it would cover an area 66m2.
mmmmm, but that's a lot more than Tramps calculation and Cockney1 poo poo'd that!!!
JUST SAW TRAMPS POST ABOVE. THANKS M8. A PROFESSIONAL AT LAST