southernmonkey
Private Member
sprayed 2 porches on this morning about 12 bags each (weber) had them all scraped down by 4 and sprayed another 50m gable this afternoon to scrape down in the morning
all on the same building.
would be worried as colour will be a different shade as they havent been left the same time before scrape.
unless they are on different builds that is.
not picking fault mate, only using my limited knowledge, and past experience
Sometimes you dont have a choice mate when the temps are all over the place. you just have to make sure the sprays are not side by side
started spraying gable at about half 1 when i was about halfway down the other guy dropped back and started scraping porchesstu scraped by 4 than you sprayed in the afternoon another gable? after 4 aint no afternoon laa its home time
did you spray the gable while waiting for the portch to firm up?
is weber still crap
where the fk av you two been anyway
sprayed 2 porches on this morning about 12 bags each (weber) had them all scraped down by 4 and sprayed another 50m gable this afternoon to scrape down in the morning
you really are my hero
you said they were roughyou really are my hero
lol i left one a day and a half and what a joke that was to scrape, serious sore armsIve heard of a gang who did a panel left it 2 weeks then tried scraping it lol
Dont make his ego any bigger nick, I would have done that house in 4 days you lazy f**k**s