rt88
Member
Not posted for a while but got conflicting ideas on how to go about a job. I've got a chimney to dry dash which isn't a massive job. When working with my dad and his boss I was always taught scratcoat one day then dry dash on another which obviously on a full house or whatever is how I would always go about it. But where I currently work with local authority because we are only really doing patch jobs we are told to scratchcoat first thing and cast late on in the day. Now with this job I'm thinking I should do it over two afternoons and split the internal job I'm on over two mornings. But at the same time I'm thinking if it would be ok to get it done in one day it would save alot of hassle from travelling between and loading and unloading tools etc. Any advice welcome. Cheers