dieselpower
Active Member
Don't know too much about this side of the game but it interests me, anyway, there's a job local to me that was started weeks ago, they stuck the insulation on ( can't see any fixings on boards) then they have just slapped a base coat on all joints( looks a mess in my opinion) then left it for weeks. However, I see bags of render and chips have arrived so will watch with interest as to how it's finished.
I thought the whole of the insulation had to be base coated with mesh embedded then a top coat but don't know enough about it..
Trouble is, this house is a dorran( one of the old roughcasted panel system houses bolted together) that you can't get a mortgage for cos the metal inside corrodes and makes it, well, ****..however, it has already been roughcasted over a good few years ago by all accounts.
I know the company doing it, they are up here quite a lot now..
Sorry for long winded post..
I thought the whole of the insulation had to be base coated with mesh embedded then a top coat but don't know enough about it..
Trouble is, this house is a dorran( one of the old roughcasted panel system houses bolted together) that you can't get a mortgage for cos the metal inside corrodes and makes it, well, ****..however, it has already been roughcasted over a good few years ago by all accounts.
I know the company doing it, they are up here quite a lot now..
Sorry for long winded post..