Jace
Well-Known Member
Yes it sounds like the water wassnt cosha but all im sayin is the sand and cement was not left to cure for ling enough and has pulled away from skim.
Also i wisb i could work for builders thst wantex sand and cement all the time 9 times out of 10 no matter how big the job is its hardwall float and set the same day. I always push for sand and cement as i prefer it but im always told nooooo. Theres nothing wrong with floating large jobs with hardwall:RpS_confused:
Also i wisb i could work for builders thst wantex sand and cement all the time 9 times out of 10 no matter how big the job is its hardwall float and set the same day. I always push for sand and cement as i prefer it but im always told nooooo. Theres nothing wrong with floating large jobs with hardwall:RpS_confused: