Those who use the sponge float method...
Anybody just put one thick coat on...spat then sponge on old walls?
I'm doing 2 coats (without cleaning out bucket between mixes) but thinking is 2 coats necessary.
Definitely no need to do 2 coats on plasterboard...but old walls?
Everything youve said is wrong its rhe opposite if anything
Think its pretty obvious of the 2 plasterboard is what you could get away 1 coating if inclinedWorks for me...what's your method then?
Think its pretty obvious of the 2 plasterboard is what you could get away 1 coating if inclined
No m8 I thought the same get it on as quickly as pos but flat no need to worry about trowel marks leave it for 15minute sponge over then very tight trowel over job done. Happy days all about timing!Stop sponging it's morally wrong if anything!
Chancers? Or people trying to find a sh*t job a bit easier?What's wrong with using a Mt the way through.bloody sponges the trade is rife with chancers
it'll be the site monkeys spouting this sponge bolloxWhat's wrong with using a Mt the way through.bloody sponges the trade is rife with chancers
Let me explain. just in case the is any misunderstanding.it'll be the site monkeys spouting this sponge bollox
What trying to find shortcuts you meanChancers? Or people trying to find a sh*t job a bit easier?
Many ways to skin a cat fellaWhat trying to find shortcuts you mean
Typical site mentality, chucking houses up which end up with numerous issues and poor buggers paying out the arse for s**t houses these days! Don’t get me wrong trying out different methods is fine but Iv seen plenty of s**t site work from numerous trades because quite frankly it’s not their rep on the line, it’s someone else’s issue.Fill your beads and scrim tape with a tight coat of skim..
Generous coat good laying on
Flatten
Spray
Sponge
Trowel
Wet trowel
finishing trowel if you like
This is how site lads do it
what a fkin faff that is....thought sponging was easier?Fill your beads and scrim tape with a tight coat of skim..
Generous coat good laying on
Flatten
Spray
Sponge
Trowel
Wet trowel
finishing trowel if you like
This is how site lads do it
it'll be the site monkeys spouting this sponge bollox
Typical site mentality, chucking houses up which end up with numerous issues and poor buggers paying out the arse for s**t houses these days! Don’t get me wrong trying out different methods is fine but Iv seen plenty of s**t site work from numerous trades because quite frankly it’s not their rep on the line, it’s someone else’s issue.
domestic work is totally different, nowhere to hide if you f**k up.
Not saying all are bud, just with how government want more housing, more pressure on contractors to finish jobs on time so I understand how it all goes. I do feel for people who spend £300,000+ on a new build when to a trained eye there are many issues.not really
I house bash and do jobs for contract managers
doesn't mean site lads are rough mate
There's more money in it but on a whole its hard for domestic to understandnot really
I house bash and do jobs for contract managers
doesn't mean site lads are rough mate
There's not may domestic plasters that earn £60k plus my friendnot really
I house bash and do jobs for contract managers
doesn't mean site lads are rough mate
Absolutely right Chris not all site lads are rough, but you are you c**t.not really
I house bash and do jobs for contract managers
doesn't mean site lads are rough mate
There's not may domestic plasters that earn £60k plus my friend
I get what you are saying and to a certain degree agree but price workers have pretty much always left a s**t job because the rates are not good on site.Typical site mentality, chucking houses up which end up with numerous issues and poor buggers paying out the arse for s**t houses these days! Don’t get me wrong trying out different methods is fine but Iv seen plenty of s**t site work from numerous trades because quite frankly it’s not their rep on the line, it’s someone else’s issue.
domestic work is totally different, nowhere to hide if you f**k up.
Makes sense mateI get what you are saying and to a certain degree agree but price workers have pretty much always left a s**t job because the rates are not good on site.