Ok guys ive been plastering forever (20yrs) and i cover all aspects. When im skimming i always 2 coat then 1 flatten, 2 trowels with water and then either a dry trowel or plaz. On a private overskim on artex a couple of weeks ago a gauge got out of control and was setting too fast so to pull it back i used my sponge float which ive never used before for skimming and the finish was PERFECT. So today i decided to use my sponge all day skimming in a new build. I had 3 gauges, 3 bags each gauge. I 1st coated then a really tight laydown and flatten at the same time, then sponge and trowel and a wipe with my plaz and its PERFECT. I think i might be converted it was a piece of p iss. Does anyone else do this????