Seems to me the only effective way of doing this by hand would be to have one spread laying on 1st pass and a labourer mixing up for him and another following behind laing on second pass with a seperate labourer mixing up for him
is the machine fcuked paul and how come your works still rough:flapper:If your really interested in seeing what difference a machine will make then ask around on here and see if you can pitch up with a machine gang for a day and see how they do things. as for what spunky says about the machine packing up, we have never had a machine pack up to the point you cant finish the spray. its normally user error apart from when the forklift drops 2 ton of render on top of your machine which happened last week. that sort of finished the day but we have 5 machines counting the ritmo so even that didn't stop us.
If your really interested in seeing what difference a machine will make then ask around on here and see if you can pitch up with a machine gang for a day and see how they do things. as for what spunky says about the machine packing up, we have never had a machine pack up to the point you cant finish the spray. its normally user error apart from when the forklift drops 2 ton of render on top of your machine which happened last week. that sort of finished the day but we have 5 machines counting the ritmo so even that didn't stop us.
is the machine fcuked paul and how come your works still rough:flapper:
i aint got one