Today 3 of us boarded ceiling cut and stuck and skimmed a 103m kitchen n were all polished up 4 12

When scrimmed n beaded your labourer mixed up 8 board finish in 2 100ltr tubs simultaneously n it was on that fast we had wait to flatten as it was too wet!!

Jus wanted know other thoughts on this as we think we done good??
 
Today 3 of us boarded ceiling cut and stuck and skimmed a 103m kitchen n were all polished up 4 12
 
When scrimmed n beaded your labourer mixed up 8 board finish in 2 100ltr tubs simultaneously n it was on that fast we had wait to flatten as it was too wet!!

Jus wanted know other thoughts on this as we think we done good??
I bet your s**t smells of flowers.
 
Its 35 sqm each on fresh board, not that impressive, me and pete did a ceiling that was 60 and he finished it on his own with the speedskim while I stood around smoking and talking s**t at him
 
So you dotted the kitchen aswell did you? Ceiling boarded,103 m2 of dotting and 103m2 of skimming done by 12? Hmmmmm me smell bullshit
 
Its 35 sqm each on fresh board, not that impressive, me and pete did a ceiling that was 60 and he finished it on his own with the speedskim while I stood around smoking and talking s**t at him
Finishing with a speedscam???
 
People get slaughtered for saying there skim 100m2 in day haha this boy dsnt know wat he's got himself into lol..he will have to set a new account up now as he will always be known as billy bullshit
 
Imagine them boys trying to negotiate a decent m2 rate..bet there on about £2m2 if that..bet he's dreaming another story as we speak..bless him
 
Poor bloke, reckon they had areal good day and thought they'd just share with us all, as they know how we all admire good workmanship and a tidy effort.......
Boom......what a misjudgement!!!!!....
He'll definitely have a complex now..........lol...no puffing of chest for this bloke ever again........he'll be quiet forevermore....
Good job there's no pics, as the slating would have gone into overdrive....lol
Banter eh? We'd be lost without it.
 
So you dotted the kitchen aswell did you? Ceiling boarded,103 m2 of dotting and 103m2 of skimming done by 12? Hmmmmm me smell bullshit
I smell R.A.F going on sticking and skimming boards same day y brag about that,did u ride into work on your Mahaaaaaa
 
I smell R.A.F going on sticking and skimming boards same day y brag about that,did u ride into work on your Mahaaaaaa
Fcking hell ritch uve been getting stuck in lately and actually writting a comment instead of just giving it a thumbs down..gud to see pal..ye I just want to know timeline in which there did it..youce got minimum 3 hours in ur gage with beading and scrimming say..he started at 7.30 so that means there boarded a 103 m2 ceiling and cut and stuck the kitchen all in a hour and half..wow..
 
They only knocked enough skin up for 80m2 too so by my reckoning they meat have only covered the paper on the boards and never gave it a 2nd coat either????
Bullshiting pissflaps


Sent from my iPhone using Tapatalk
 
Back
Top