I will be tape and joining a cupboard.... welll 2 long cupboard.... they are far too awkward to skim....

Got a chippy in today to get things pushed along as well :-)

Also need to miss coat and fill janes cupboards in....lol
 

Attachments

  • todays jobs...
    1414569076217.webp
    19.6 KB · Views: 329
fukin right it is...lol... trying to get her showered , then off to meadowhall to see the hallowean stuff, probably cost more than going to work, time ive done.. worth it tho..
 
Fixing some coming. Half is still on the ceiling. Half is on the floor. Ha. In a small room. No room to move.. Barely get a ladder in. Was sweating me face off but managed to get the window open after being painted shut. The freeing cold air is fantastic
Last day working bar the odd couple days until January. :)
 
Fixing some coming. Half is still on the ceiling. Half is on the floor. Ha. In a small room. No room to move.. Barely get a ladder in. Was sweating me face off but managed to get the window open after being painted shut. The freeing cold air is fantastic
Last day working bar the odd couple days until January. :)

How come
 
Sounds good Frank. Any pictures of your showroom? It's interesting the different ways people have there showrooms with cornice.
 
Off till Jan. Because the baby is due March and I haven't touched our new house in over 2 months. There's a good solid 3 months work left before its even possibly liveable. All a big task when doing it on your own. Can't just sit behind a desk Barking like some... *cough*@Danny*cough,
 
been screeding for 5 days now , 100 mil thick , pissed off ,in pain , and the builder wants the job done for xmas , and the plumber not tested his under floor heating ...................
 
Not tested and you've already screeded it? Ffs


yep , done most of the under floor stuff 1-2 days left screeding , rush job on a lovely home, both builder and client , wants it done for xmas such a shame really , but hope it works out but can only see problems further done the line . I want my screed covered and left , builder wants it un covered and a dehumidifier in for the tiler .
 
it is a shame Mikeadams1985 but im trying to put my point across , but no one cares at this stage
 
I'm sure everyone's sick to death of disclaimers, almost every job for a builder is always a rush did a front of a terrace for a builder this year the fcker painted it 3 days later!!
 
I'm sure everyone's sick to death of disclaimers, almost every job for a builder is always a rush did a front of a terrace for a builder this year the fcker painted it 3 days later!!

they dont really care as much as we do , but its all about coin to them , so **** em
 
ripped an old back boiler out of chimney breast this morning, blocked it up, new spanlight. smashed an old cast bath to pieces with a sledgie this afternoon to get it out. my ears keep ringing. back there in a a week or two. how the fcuk did they get those cast baths in ffs. someone told me they used to put them on their backs like a tortoise and crawl up the stairs with them ,,, :RpS_unsure:
 
they dont really care as much as we do , but its all about coin to them , so **** em

It's frequently some daft b4stard that's watched Grand Designs or homes under the hammer and thinks everything happens in half the time it actually takes. Then you'll get some idiot who gets greedy and takes the job on promising all sorts of nonsense. He then gathers all of the sh1t into a big ball at the top of the hill ready for the trades and subbies to start coming up.

Unfortunately there is far too much thick in the world, and apparently it's illegal to try and thin it out. :RpS_thumbdn:
 
yep , done most of the under floor stuff 1-2 days left screeding , rush job on a lovely home, both builder and client , wants it done for xmas such a shame really , but hope it works out but can only see problems further done the line . I want my screed covered and left , builder wants it un covered and a dehumidifier in for the tiler .

make the builder sign a disclaimer. when we screed for the mod it has to be flooded every day and covered for 10 days.
 