just thought id mention as I was asking about what people use when doing lids as have a bad back...
anyway on a proper refurb empty house job at mo...so bought 2 cheapo 700mm long hopups...
and 2 plamks @ 2.4 and then bought a sheet of ply and cut it @700mm x 2.4...and screwed over the boards...
managed to do 2 of the small bedrooms with out having to get off at all with the tub on the board etc...worked well!!!
recon can probabley pull about 6m2 at a time without moving so most lids prob only need to move a couple or 3 times...
thought might be a halfway house between scaff full room out aposed to just using hopups etc
anyway on a proper refurb empty house job at mo...so bought 2 cheapo 700mm long hopups...
and 2 plamks @ 2.4 and then bought a sheet of ply and cut it @700mm x 2.4...and screwed over the boards...
managed to do 2 of the small bedrooms with out having to get off at all with the tub on the board etc...worked well!!!
recon can probabley pull about 6m2 at a time without moving so most lids prob only need to move a couple or 3 times...
thought might be a halfway house between scaff full room out aposed to just using hopups etc