Hi all,
We have applied 4mm base coat of vimark polyfix over render carrier boards, with mesh embedded, went on a treat and simple.
We are now applying the top coat of the polyfix base coat 2mm, but its taking an age to go off and to try and flatten off then sponge prior to the top coat.
With the polyfix being an adhesive its like trying to get a really flat finish with floor adhesive... the product sucks and drags constantly. Should be half hour to hour, but its taking 5-6hours.
Anyone else come across this or found a better application method of the polyfix in the uk...? (Where weather is so unpredictable)....
Ty
Ray
We have applied 4mm base coat of vimark polyfix over render carrier boards, with mesh embedded, went on a treat and simple.
We are now applying the top coat of the polyfix base coat 2mm, but its taking an age to go off and to try and flatten off then sponge prior to the top coat.
With the polyfix being an adhesive its like trying to get a really flat finish with floor adhesive... the product sucks and drags constantly. Should be half hour to hour, but its taking 5-6hours.
Anyone else come across this or found a better application method of the polyfix in the uk...? (Where weather is so unpredictable)....
Ty
Ray