Naz79
New Member
Morning all,
I have a apex area approximately 7meters x 3 meters, minus the window leaves you with a 10sq meter area which I need rendering in the next couple of weeks if the weather permits.
It’s a timber framed loft conversion so the area has been plyboarded. Being timber there’s obviously going to be movement so need to be advised the best method to use with this and the cost to do it,
The house is located in the IG6 area of Essex, I have Scaffolding up already.
Let me know if anyone close by is intersted to take the job on. I’ll get a couple of photos up later.
Thanks
I have a apex area approximately 7meters x 3 meters, minus the window leaves you with a 10sq meter area which I need rendering in the next couple of weeks if the weather permits.
It’s a timber framed loft conversion so the area has been plyboarded. Being timber there’s obviously going to be movement so need to be advised the best method to use with this and the cost to do it,
The house is located in the IG6 area of Essex, I have Scaffolding up already.
Let me know if anyone close by is intersted to take the job on. I’ll get a couple of photos up later.
Thanks