Doing a job as per Architect spec on a timber frame build.
Spec is HP12 on Multirend carrier board to be finished in k rend tc1,5 silicone.
2 weeks ago I based and meshed 3 dormers and went this morning to prime them. I noticed cracks on joints and stress cracks on 1 dormer cheek.
I'm reluctant to put the top coat over this and think it's the timbers drying out behind the boards.
Any advice fellas.
Spec is HP12 on Multirend carrier board to be finished in k rend tc1,5 silicone.
2 weeks ago I based and meshed 3 dormers and went this morning to prime them. I noticed cracks on joints and stress cracks on 1 dormer cheek.
I'm reluctant to put the top coat over this and think it's the timbers drying out behind the boards.
Any advice fellas.