There are some right tight arses out there . Went to price a job up other day . Nice house two new Audi’s on the drive . I done some work before for this guy and already knew he was tight . He rang me other day and I went to look at a bedroom he started decorating. One wall about 3.5m long to reskim and another wall where plaster has blown off latts needed to be chopped off boarded and skimmed and about 4m of coving to go up . Price was £300 inc materials. His jaw dropped said he’d think about it and never got back to me . Yet he eas
Telling how he spent 2k on a fricken whirlpool bath
Must be tight as that's good priceThere are some right tight arses out there . Went to price a job up other day . Nice house two new Audi’s on the drive . I done some work before for this guy and already knew he was tight . He rang me other day and I went to look at a bedroom he started decorating. One wall about 3.5m long to reskim and another wall where plaster has blown off latts needed to be chopped off boarded and skimmed and about 4m of coving to go up . Price was £300 inc materials. His jaw dropped said he’d think about it and never got back to me . Yet he eas
Telling how he spent 2k on a fricken whirlpool bath
Just a steady day for me and lad plus materials . I sometimes don’t understand what people expect . They were desperate to get it sorted too so I even offered to work Sunday .Must be tight as that's good price
On the other hand i quotes up a nasty staircase the other day which I really wasn’t bothered about so priced accordingly. I didn’t think they would have it done they looked looked like time wasters to be honest . They rang me back a day later and told me to book it in . Obviously had other quotesJust a steady day for me and lad plus materials . I sometimes don’t understand what people expect . They were desperate to get it sorted too so I even offered to work Sunday .
How much knocking off was there. I take a joey day before if any to do. Can't cope with dust . Leave em to it for dayJust a steady day for me and lad plus materials . I sometimes don’t understand what people expect . They were desperate to get it sorted too so I even offered to work Sunday .
Only one wall . 3.5m on latt.How much knocking off was there. I take a joey day before if any to do. Can't cope with dust . Leave em to it for day
Ufffgghhh. f**k that . Leave lad doing itOnly one wall . 3.5m on latt.
Could offer me 500 to knock that wall of and I.ll happily let someone else do it. Ate enough dust in my time lolWhat I’m getting at is a price is what someone’s willing to pay . Some people are happy to spend 1k on a new tv but scrimp on other things . But others know how much hard work plastering is and think it’s value for money .
[QUOTE="lurpak, post: 1215060, member: 35997
[QUOTE="lurpak, post: 1215060, member: 35997
Add pepper while frying. Try gratting a bit of cheese on egg flip over for few secs then back over to v slightly crisp bottom.
And that's why u don't make money.I'll do the job for £100
He’d spend more than that on a carpet and change it after a few years or on wallpapering and decorating then change that after a year or so but something expected to last for ever they want to pay 50 p forThere are some right tight arses out there . Went to price a job up other day . Nice house two new Audi’s on the drive . I done some work before for this guy and already knew he was tight . He rang me other day and I went to look at a bedroom he started decorating. One wall about 3.5m long to reskim and another wall where plaster has blown off latts needed to be chopped off boarded and skimmed and about 4m of coving to go up . Price was £300 inc materials. His jaw dropped said he’d think about it and never got back to me . Yet he eas
Telling how he spent 2k on a fricken whirlpool bath
I'd say 4 hoursIf its boarded ready to go 2 hours
This job would be a doddle. It's already boarded so the room is likely empty. It's board, so no scraping or pva etc. I'd put a sheet down and mix up and go.
Put it on, lay down same mix. load van. tidy. finish ceiling. gone. 2.5 hours MAX. I'd aim for 2.
Materials are loaded at the start of the week, I've always got a few bags in the van so would be fine for this bag n a half ceiling.
I get alot of patching/small jobs which I try to put all in on 1 day, so I'd look at doing that ceiling in the morning then going to another small job or prep a bigger one.
After everything I'd walk away with 200 min, then go to another job.
Or the skim could hang around for 4 hoursU have not taken in the time of priceing the job. Then u have to get your water in tools in sheet up. Scrim up. Mix. Get it on find somewhere to wash out. Clean up. Put tools back in the van. Plus the time talking s**t to the client when you get there to do it. It's around 4 hours.
U have not taken in the time of priceing the job. Then u have to get your water in tools in sheet up. Scrim up. Mix. Get it on find somewhere to wash out. Clean up. Put tools back in the van. Plus the time talking s**t to the client when you get there to do it. It's around 4 hours.
Funny enough I priced a little domestic job last night, dont price many but came to 47m one room and we charge A tenner a metre going over old s**t so said 500 notes with the mats and her jaw hit the floor and said she had a quote a lot less than that (320),so I left thinking no chance of getting that 1 and she phone me a hour later telling me she’s gonna go with my quote purely on my professionalism.how do I like that one lumpy Lurpak
Rd seesThere are some right tight arses out there . Went to price a job up other day . Nice house two new Audi’s on the drive . I done some work before for this guy and already knew he was tight . He rang me other day and I went to look at a bedroom he started decorating. One wall about 3.5m long to reskim and another wall where plaster has blown off latts needed to be chopped off boarded and skimmed and about 4m of coving to go up . Price was £300 inc materials. His jaw dropped said he’d think about it and never got back to me . Yet he eas
Telling how he spent 2k on a fricken whirlpool bath
Yes I looked at one they spent 10,000grand on kichen they was a little wall they did not plaster I said 80pounds she said I'll thing about itThere are some right tight arses out there . Went to price a job up other day . Nice house two new Audi’s on the drive . I done some work before for this guy and already knew he was tight . He rang me other day and I went to look at a bedroom he started decorating. One wall about 3.5m long to reskim and another wall where plaster has blown off latts needed to be chopped off boarded and skimmed and about 4m of coving to go up . Price was £300 inc materials. His jaw dropped said he’d think about it and never got back to me . Yet he eas
Telling how he spent 2k on a fricken whirlpool bath
She mite as well have f**k**g stab my in the f**k**g heart the bitchRd sees
Yes I looked at one they spent 10,000grand on kichen they was a little wall they did not plaster I said 80pounds she said I'll thing about it
Was she a Milf ?.She mite as well have f**k**g stab my in the f**k**g heart the bitch
She mite as well have f**k**g stab my in the f**k**g heart the bitch
FloorEw building plastic . Can’t imagin anything worse to cover a flirt with when plastering
Floor
You only need to drop a small amount onto plastic then time you’ve walked it around it looks terrible. I’d put a dust sheet over plasticHow can someone drop that much gear
You only need to drop a small amount onto plastic then time you’ve walked it around it looks terrible. I’d put a dust sheet over plastic
Lol if . Don’t know what it is but if I’m working in a showroom condition house i always seem to drop a bit in the worst place youReal dons don’t drop any