Had these two walls to board like a jigsaw and tax the brain....think I did alright...anyone else got as hard a day as this???
I once got told never to use adhesive to fill as it drys that hard theres more chance of cracks
I tape em as well . Even tape chasers if all walls getting doneI was also told that but to be honest if you are joining two different materials together they will both expand and contract at different rates anyway
As hard as this? Lovely cushty day thatHad these two walls to board like a jigsaw and tax the brain....think I did alright...anyone else got as hard a day as this???
As hard as this? Lovely cushty day that
I battened, and boarded an 11 meter stone wall yesterday. Pissed as f**k on old stone. Skim it today along with another couple of walls. Get paid and get drunk for 4 days
View attachment 34132
try that for a jigsaw
View attachment 34132
try that for a jigsaw
Aye but it’s only half a wall with all them windows!As hard as this? Lovely cushty day that
I battened, and boarded an 11 meter stone wall yesterday. Pissed as f**k on old stone. Skim it today along with another couple of walls. Get paid and get drunk for 4 days
per box lolHope you don’t charge by the sqm lol
Ha that it is. I think we'd all much prefer the windows not to be in it though. Stop beads look nice when it's all finished but they're a faffAye but it’s only half a wall with all them windows!
View attachment 34132
try that for a jigsaw
Charge by the bead.View attachment 34132
try that for a jigsaw
That socket in the left hand corner would of made this anew awkward job. Just sayingView attachment 34132
try that for a jigsaw
charged on a day rate... 5 man days plus materials...ea h box will have a downlighter and a vase....Charge by the bead.