Just finished job and after 36 yrs in this game I have never seen anything like it. Building out of square, walls out of plumb by as much as 300mm in 2.4m and not in line by god only knows how much. The boarding was awful, upside down, 40-50 mm away from the wall, no studs in certain places and 9.5mm boards spanning 600mm centres. Think you might be getting the picture now.
Anyhow I pointed all this out to the customer and I was told to do what I could do with it. Managed to get a day rate and explained that it might/would crack and that I was not responsible for any failings. Always say that if I'm told to put s**t on the wall I put s**t on the wall but how far do we have to go? Having said all that it was a really enjoyable job, certainly different to the normal run of the mill job but I'm questioning myself if I did the right thing by doing it.
Anyhow I pointed all this out to the customer and I was told to do what I could do with it. Managed to get a day rate and explained that it might/would crack and that I was not responsible for any failings. Always say that if I'm told to put s**t on the wall I put s**t on the wall but how far do we have to go? Having said all that it was a really enjoyable job, certainly different to the normal run of the mill job but I'm questioning myself if I did the right thing by doing it.