I don't often screed floors (if I can avoid it :RpS_biggrin but I have to do a smallish floor of 15 square metres. It's a bit thicker than usual due to some medical equipment, electric wheel chair etc etc running over it. So it'll be 100 mm on celotex on concrete.
Anyway, as I'll be flying solo on this one I can't make my mind up for the choice between having the 1.5 cube delivered, or mixing it as I go.
On the one hand mixing it is a pain, on the other, delivered it'll be tipped in and then I'll have to spread and level it from there which seems like hard work!
Working alone what'd be your preference, mix it as you go, or tipped in a heap and level it from there?
Anyway, as I'll be flying solo on this one I can't make my mind up for the choice between having the 1.5 cube delivered, or mixing it as I go.
On the one hand mixing it is a pain, on the other, delivered it'll be tipped in and then I'll have to spread and level it from there which seems like hard work!
Working alone what'd be your preference, mix it as you go, or tipped in a heap and level it from there?