john simpson
Well-Known Member
What's the general setting time for dry screed?
48 hours and still spongey.
Was 70mm with the odd bit deeper and a few spots shy.
Black plastic and insulation, only odd thing was light polythene type plastic over all that, then the screed on top.
House was damp at one time as work is dpc but air feels dry, locked up so no real circulation.
Should I be worried or leave it for the weekend?
Any ideas why it is not dry enough to walk on?
48 hours and still spongey.
Was 70mm with the odd bit deeper and a few spots shy.
Black plastic and insulation, only odd thing was light polythene type plastic over all that, then the screed on top.
House was damp at one time as work is dpc but air feels dry, locked up so no real circulation.
Should I be worried or leave it for the weekend?
Any ideas why it is not dry enough to walk on?