Tinytom
Well-Known Member
So I fancy building a single story extension as a pose to a conservatory. Aim to add value and give me more room at home. Iv been looking into it and it seems it would come under permitted development, iv got a man hold right where I’d want to build it. Any building folk on here that can advise me on the BC side of things? Do they need to come out before during after or all 3? I’ll do everything myself bar the electrical work. Priced it up at just under 4K for the materials not including skips and conny for the raft. Sound about right? It would be approx 3m x 4m velux in the roof
@imago
@imago