Evening all - not sure if this is the right section for a screed question but.....
I want to have a go at screeding my extension floor myself as no one seems to want the job for a labour only day.
The floor is 6.5 x 4.0 sq metres by about 70mm and is straight on to the concrete slab (insulation underneath) so only rad speedfit on the slab base.
Ive just got 4 ton of Thames Wash delivered and will pick up 40 odd bags of dust soon and bag of fibres. Also want to hire a pan mixer.
Do any screeders think I could do it myself in bays? Im getting on and by myself so doubt if I will get to mix it and lay it in a day. If I section it off with battens can I go back on it the next day and screed up to the previous days finish line. Should I put wall ties in the joint and do I need to keep it moist when finished ie a light spray of water every day?
Manythanks for any help.
I want to have a go at screeding my extension floor myself as no one seems to want the job for a labour only day.
The floor is 6.5 x 4.0 sq metres by about 70mm and is straight on to the concrete slab (insulation underneath) so only rad speedfit on the slab base.
Ive just got 4 ton of Thames Wash delivered and will pick up 40 odd bags of dust soon and bag of fibres. Also want to hire a pan mixer.
Do any screeders think I could do it myself in bays? Im getting on and by myself so doubt if I will get to mix it and lay it in a day. If I section it off with battens can I go back on it the next day and screed up to the previous days finish line. Should I put wall ties in the joint and do I need to keep it moist when finished ie a light spray of water every day?
Manythanks for any help.