Doing an ewi job at the mo and have a gas box and pipe to work round. Specs I have been given say give a 25mm clearence around the box for maintenence and 100mm either side of the rising supply pipe. But you can box the pipe in so long as there is a way to remove the boxing in for maintenence and you have created ventilation.
I have been around the merchants both building and plumbing and no one stocks the plastic ducting for the rising gas pipe. And I think leaving a 225mm gap will look crap.
Anyone any ideas on how to tackle the gas pipe?
Damaged the box as well and need to replace it but that is another story.