Pl plastering
Well-Known Member
90120Beverley hills
90120Beverley hills
You've gotta love em zomf**k**g Narnia more like!!!!
4 x 4 room . Boarded for 11 half hour snap. Skimmed for 2. 30 ish tidy up f**k off
How much would you charge out of interest?
£34.77How much would you charge out of interest?
50 quidHow much would you charge out of interest?
50 quid
Just for difference though I gave 66 grand for my 3 bed end terraceThat won't be a bad price soon mate we are in a race to the bottom!!
Just for difference though I gave 66 grand for my 3 bed end terrace
I do a day and my out goings for month are almost coveredThere you go then mate think I'd prefer to be in your position!
Not if the p**i’s get in there firstYou would get 5 terraces minimum for that in south Yorkshire!
Well if you transfer over £300 I'll unwrap a chocolate bar for and let you know if you've won.
Just for difference though I gave 66 grand for my 3 bed end terrace
I allow two days too , but I protect everything and fully scaffold the room , there’s loads of dead hero’s in the cemetery that done them in 5 hoursDont know what's maddest 600 to board a ceiling or takes 2 of em 2 days ......I.m alow but reckon I.ll be done 3 oclock latest.........
f**k me I sound like @lurpak LOL
I allow two days too , but I protect everything and fully scaffold the room , there’s loads of dead hero’s in the cemetery that done them in 5 hours
I’m on my own and just turned 55 , I price for 2 days , protect stairs with carpet protection if up stairs, take up, 10/12 6x3, 3/ 4 multi, erect scaffold, that’s 10 o clock , find joists, board ceiling, rule out any wavy ceiling lines , that’s day 1.... day 2 , pva any Previous day prep work , set ceiling, drop scaffold , and clean , easy £600 +I allow two days too , but I protect everything and fully scaffold the room , there’s loads of dead hero’s in the cemetery that done them in 5 hours
Your forgetting having to pick up the gear, time doing a quote/seeing the job.4 x 4 room . Boarded for 11 half hour snap. Skimmed for 2. 30 ish tidy up f**k off
Who said it was up stairsI’m on my own and just turned 55 , I price for 2 days , protect stairs with carpet protection if up stairs, take up, 10/12 6x3, 3/ 4 multi, erect scaffold, that’s 10 o clock , find joists, board ceiling, rule out any wavy ceiling lines , that’s day 1.... day 2 , pva any Previous day prep work , set ceiling, drop scaffold , and clean , easy £600 +
It would be the same if it was downstairsWho said it was up stairs
I didWho said it was up stairs
I said , if upstairsWho said it was up stairs
It would be the same if it was downstairs
So ye did lolI said , if upstairs
yea if they only had a toilet upstairs!Would you still roll n stroll stairs
Wtf you pva’ing? LolI’m on my own and just turned 55 , I price for 2 days , protect stairs with carpet protection if up stairs, take up, 10/12 6x3, 3/ 4 multi, erect scaffold, that’s 10 o clock , find joists, board ceiling, rule out any wavy ceiling lines , that’s day 1.... day 2 , pva any Previous day prep work , set ceiling, drop scaffold , and clean , easy £600 +
Just go down side of shedyea if they only had a toilet upstairs!
Where he's straightened up the ceiling lines etc.Wtf you pva’ing? Lol
I’m a professional johnJust go down side of shed
Sure this was a straight forward overboard and skim .Where he's straightened up the ceiling lines etc.
Wtf you pva’ing? Lol
I got stuck down a shed having a s**tI’m a professional john
I scrim and fill the joints as well the day before 9 times out of 10 the boards never fit flush , so I feather out ( giving my secrets away now)Wtf you pva’ing? Lol