If you need 6.4cubic meters, you would be better off ordering it in mate, sod that mixing it by hand in a mixer. Will probably gonna be a 1.5 lorry load of concrete. Or get a mixamate in they mix as much as you need not more or lessI need to work out what to order for the concrete base...
Got a volume of 6.4 meters...
What do I need?
That’s what I use and it’s never far offusually about 2.2 ton to cubic metre
i did think thats a f ucking big shed....Actually my maths was wrong....
It is 1.5m3
Just remember if you mix yourself check the weight of the dumpy bags when ordering or you could end up short.Actually my maths was wrong....
It is 1.5m3
3.2 meters wide by 5.5 meters long..... whether I go all the way is another thing though
About 300mmwhat is the depth?
Would be cheaper to put rebar in and 6" concreteAbout 300mm
Would be cheaper to put rebar in and 6" concrete
3.2 meters wide by 5.5 meters long..... whether I go all the way is another thing though