Skyshed
Member
Evening all,
I am planning on running a cornice with bonding and finish, did consider adding a drop of lime, could anyone give me an idea of how much lime to use and how long to leave the bonding before going over with multi?
How many metre to run at a time?
The stairwell ceiling in question is about 3.5mx3m so 13m total run, projection about 8", drop about 6",
Useful advice welcome
Cheers
I am planning on running a cornice with bonding and finish, did consider adding a drop of lime, could anyone give me an idea of how much lime to use and how long to leave the bonding before going over with multi?
How many metre to run at a time?
The stairwell ceiling in question is about 3.5mx3m so 13m total run, projection about 8", drop about 6",
Useful advice welcome
Cheers