Knauf spray plaster

Answering the phone lol come on Danny u may get back on the trowel for a week just to remember real work. ;)

lol I may not be sweating my nuts off anymore but I am still mentally drained at the end of the day :D

I am plastering in a few weeks time :D got a bedroom to do :D
 
lol I may not be sweating my nuts off anymore but I am still mentally drained at the end of the day :D

I am plastering in a few weeks time :D got a bedroom to do :D
Do you want a hand I'll show you how to sponge. Am mentally handicapped at the end of each day:(
 
I use the Knauf system sometimes on reskims. The only reason I do it is because it's easier on the body which is nice when you have sore shoulders and bad back. This fire damage project I used Knauf backing and finish. Then finished off with a mist coat with the paint setup.
Knauf spray plaster
Knauf spray plaster
Knauf spray plaster
Knauf spray plaster



Sent from my iPhone using Tapatalk
 
I use the Knauf system sometimes on reskims. The only reason I do it is because it's easier on the body which is nice when you have sore shoulders and bad back. This fire damage project I used Knauf backing and finish. Then finished off with a mist coat with the paint setup.
Knauf spray plaster
Knauf spray plaster
Knauf spray plaster
Knauf spray plaster



Sent from my iPhone using Tapatalk
Looks the sort of place the bouncers would drag you to
 
I've no doubt you do Steve I was thinking more on the domestic side of things. Much easier on the joints but takes much longer. Can't have it the best of both I suppose.
As curry says you can earn more the quicker you get. In a domestic job I charge the same but it's an easy 3 days for example if I'm doing a hallway 1st day prep and airless backing 2 day airless finish 3 day sanding. 1st day is the hardest day but not as hard as skimming the traditional way.


Sent from my iPhone using Tapatalk
 
As curry says you can earn more the quicker you get. In a domestic job I charge the same but it's an easy 3 days for example if I'm doing a hallway 1st day prep and airless backing 2 day airless finish 3 day sanding. 1st day is the hardest day but not as hard as skimming the traditional way.


Sent from my iPhone using Tapatalk
Where are you based? Be good to come and see it in action.
 
Back
Top