New Member
Firstly I would like to say hello!
I've been lurking on here for a while reading as much info as possible.
a bit of background info,
I'm a serial DIYer and last Year decided to build my self a two story extension, so far I have done everything myself except pouring the concrete and lifting the lintels in place, which I thought was a two man job. I've kept the planners and building inspector happy so far
and would like to stand back at the end and say " I built that"
I plan on using S&C render with a tyrolean finish on the top coat.
Now to my questions
Is it possible to render a job like this on your own without experience?
What is scud and when is it used?
What is a slurry mix and when is it used?
What's the best way to tackle thermalites, in laymans terms please.
i as
i also plan on doing the internal plastering so will be asking for advice on that later in the plasterers section
Cheers in advance.
Disco
I've been lurking on here for a while reading as much info as possible.
a bit of background info,
I'm a serial DIYer and last Year decided to build my self a two story extension, so far I have done everything myself except pouring the concrete and lifting the lintels in place, which I thought was a two man job. I've kept the planners and building inspector happy so far
and would like to stand back at the end and say " I built that"
I plan on using S&C render with a tyrolean finish on the top coat.
Now to my questions
Is it possible to render a job like this on your own without experience?
What is scud and when is it used?
What is a slurry mix and when is it used?
What's the best way to tackle thermalites, in laymans terms please.
i as
i also plan on doing the internal plastering so will be asking for advice on that later in the plasterers section
Cheers in advance.
Disco