I have about a 1 metre square screed to repair (25mm deep), Im going to mix a 4:1 with sharp sand, adding some fibre and sbr.
It’s the slurry ( I will do a slurry) I want to know about, I’ve read that some people let it dry over night? and some do it tacky say 20 mins or something??. I know it’s a floor and not wall render, but a slurry is a slurry, what’s the correct method please.
It’s the slurry ( I will do a slurry) I want to know about, I’ve read that some people let it dry over night? and some do it tacky say 20 mins or something??. I know it’s a floor and not wall render, but a slurry is a slurry, what’s the correct method please.