I have the extension Hopper with the ritmo. Can do 70m2 of ocr no problem with the ritmo and my Labourer. I average 50m2 a day with the 2 of us takes about 2hours. And it's easy to move the ritmo about and can plug in to the mains if it's there.Three men with the ritmo, two on a G4, happy enough spraying 40 bags a day either way. When you have the odd 70m2 gable, 3 phase Clemo, all the way to the boozer.
We use a G4 and a Ritmo, G4 is the real deal for outsides, gets it on faster so finish sooner and have a life.
Its down to what render u spraying. They all different on the r@s. I average about 35 to 40 bags with me and my Labourer. That's 30kg bags I get 1.6m2 out of a baghow Many bags of render do u use a day with the ritmo? And bags per r&s??
Who makes that? Is the 2 coat?
Where u basedWho makes that? Is the 2 coat?
Wasnt yours the G4 clone like you had in that K Rend e grade video. Les had one for sale last week. Good machines by all accounts.
Mallow ,cork ,wats wrong with d gp stuff,is it s**t to float ??
Hi pal 1st Qs why you think it’s worn out ?Hi,just wondering if any 1 is having trouble with there rotor and stator on d pft ritmoL,have mine about 4 months and on my 4th rotor and stator and even kd 1 that’s on it now has 124 bags gone through it and i say it will do 1 more day of sparying and illegal
Have to change it,I’m using gyproc hard coat, 15 meter hose,water set at 375
It sprays out water for about 20 seconds and den hardcoat for about 2mims and so on,tested 2 r&s and ya they were there worn out and how do u mean unwind when not in action?? Take apart the r&s??
O ya,could be, small world,the hard coat is spraying fine now,only bother is for the r&s wearing so fast,are u using the druatend all the time ?? How is it to float ??
Did u get 183 bags out of the r@s? That would be around 550m2 still not 2 mad. How much u paying for the r@sEven yesterday there now,is to change the r&s ,and it only had 183 bags of hardcoat some,that’s nothing like and I’m doing evening to help the life of the r&s
u could get a clamp r@s should get more out of that.Is that the best r&s for hardcoat ???
I'll give u £80 lolJust to let you know, we have the B4-2L Rotor and Stators in stock for £85.00 + VAT
?How for if that set up ??