Rendering In The Cold

Status
Not open for further replies.
Near the coast here so only had 1 day where its been to cold to render outside so far, it warms up by 9am ish then go like the clappers till 2 so can finish up b4 temps drop off.
 
Hit a quiet spot /gap coming up next week so took it on,the bricks can't point so I will do it..

i watched a tv program that the last week of jan is the hardest week of the year to earn a living. over spending over christmas and waiting for the jan pay check, that is why the shops have their sales cut this week to try to get some money in.
 
Working down Alderly Edge its about 2 during the day last week. Bit of bead, stand near the fire. Bit of bead, stand nar the fire, bit of bead, stand near the fire.

That's pretty much how my week went. Next week with a little more temp were hoping to spray 2 jobs
 
Rendered a garage today ,had scratched it a few weeks ago,solid block scratch 4/1 withouthout waterproofer and put a little Limę in it,had it Floated and sponged at 12.30 .
floated a wall yesterday ,had scratched a couple of weeks ago over ribbed lath which was on brickwork with a membrane between it and the wall ,it pulled in immediately which wasn't the plan, had to wet it to float and sponge each level.
 
Working down Alderly Edge its about 2 during the day last week. Bit of bead, stand near the fire. Bit of bead, stand nar the fire, bit of bead, stand near the fire.

That's pretty much how my week went. Next week with a little more temp were hoping to spray 2 jobs

weve had similar last week,
barely got above freezing through day. I spent more time stood next to our blow heater than on the tools.
 
Status
Not open for further replies.
Back
Top