efc plastering
Member
whats the script with this insulation,we're fixing 100 mm fire stop between each floor on ablock of flats its soaking wet like a sponge with this rain we've had surely it has to be dry before we mesh it and render
Thats an interestin method.basically use the base coat to protect until scrim process.
Is that right?
Would that not put price up bit tho if works out alot of area?
I likd it