One thing I never seem to get wrong is the quantities of material I need for roughcast.
I’ve got a 145m2 job almost ready for dashing and I usually do a mix of 4:1 butter coat and 4:2:1:1 for the dash.
It’s been about a year since I rouchcasted last and had loads of gear left to take back
Is anyone able to help me estimate quantities more accurately?
I’ve got a 145m2 job almost ready for dashing and I usually do a mix of 4:1 butter coat and 4:2:1:1 for the dash.
It’s been about a year since I rouchcasted last and had loads of gear left to take back
Is anyone able to help me estimate quantities more accurately?