Roughcast quantities

Dr.B

Active Member
One thing I never seem to get wrong is the quantities of material I need for roughcast.
I’ve got a 145m2 job almost ready for dashing and I usually do a mix of 4:1 butter coat and 4:2:1:1 for the dash.
It’s been about a year since I rouchcasted last and had loads of gear left to take back
Is anyone able to help me estimate quantities more accurately?
 
Last edited:
One thing I never seem to get wrong is the quantities of material I need for roughcast.
I’ve got a 145m2 job almost ready for dashing and I usually do a mix of 4:1 butter coat and 4:2:1:1 for the dash.
It’s been about a year since I rouchcasted last and had loads of gear left to take back
Is anyone able to help me estimate quantities more accurately?

@essexandy
 
One thing I never seem to get wrong is the quantities of material I need for roughcast.
I’ve got a 145m2 job almost ready for dashing and I usually do a mix of 4:1 butter coat and 4:2:1:1 for the dash.
It’s been about a year since I rouchcasted last and had loads of gear left to take back
Is anyone able to help me estimate quantities more accurately?