Hi Guys!
Have been tanking out old stone work walls ,so needle gunning stonework to remove old paint and keying up walls, Then dubbing out walls to get rid of uneveness, followed by two coats of trowelled on Vandex.
This is then followed next day with final sand cement render coat, about 20mm thick at three to one mix, this coat is usually on walls by 9am , but it doesn,t dry out enough to finally achieve float finish until 6 to 7 pm so we have to come back evenings to float finish it off.
Any tips to speed up this drying ,as obviously the Vandex is not pulling any moisture out!!
cheers ash
Have been tanking out old stone work walls ,so needle gunning stonework to remove old paint and keying up walls, Then dubbing out walls to get rid of uneveness, followed by two coats of trowelled on Vandex.
This is then followed next day with final sand cement render coat, about 20mm thick at three to one mix, this coat is usually on walls by 9am , but it doesn,t dry out enough to finally achieve float finish until 6 to 7 pm so we have to come back evenings to float finish it off.
Any tips to speed up this drying ,as obviously the Vandex is not pulling any moisture out!!
cheers ash