Its wank and rough as arseholes. Wouldn't even attempt to try it and I'm on site every dayI lay in with same gear which is apparently 1 coat. I don’t agree with that tho.
f**k knows how anyone can actually put 1 coat on board. Tried it a few times too much work
Its wank and rough as arseholes. Wouldn't even attempt to try it and I'm on site every day
Agree there..can give it a semi flatten when you lay 2nd coat on..dont save time either wayjust don’t see how it’s done. First coat on board is f**k**g minging. Only takes shape when lay in
I've been looking at spreads 1 coating g boards for years it looks a total disgrace. Scrim showing beads dished ect ect . Maybe theres a rare few who can pull it off but I ain't met one in my 30year stint
I can get doing the odd wall or cupboard but surely not everything, not possible if you ask medisgusting practice if you ask me.
would never attempt it
I've been looking at spreads 1 coating g boards for years it looks a total disgrace. Scrim showing beads dished ect ect . Maybe theres a rare few who can pull it off but I ain't met one in my 30year stint
Thing is please dont put pics up of freshly put on plaster of one coat work as it says f**k all really..doesn't tell the story
Easy said on a forum, would love to snag your work. Bet it's not as good as you thinkbunch of fuuckkng amateurs mate
my 1 coating make all these look like clowns
Of freshly drying out plaster? Bolloxs..if your putting work up put it up dried out atleastabsolute tosh
Of freshly drying out plaster? Bolloxs..if your putting work up put it up dried out atleast
View attachment 42308Piece of piss when you got s*p*r*lex even back then eh @algeeman
Show me a fully dried out picture..after 3 days or sumat..are you taking the f**k**g piss mate
have you any idea how many pics I've thrown up on here ??
Maybe on little shithouse appartments in the centre of Manchester youd get away with it or pokey housing associations in run down areas of manchester but on decent gaffes we do no chance we wouldn't get paidOf freshly drying out plaster? Bolloxs..if your putting work up put it up dried out atleast
It's just bolloxs when people put pictures up of plasters that's been on a few hoursMaybe on little shithouse appartments in the centre of Manchester youd get away with it or pokey housing associations in run down areas of manchester but on decent gaffes we do no chance we wouldn't get paid View attachment 42309View attachment 42309
I’m amazed how u do it I know lads say they put on a thicker mix ,but to get it all on plus the amount u do ,in one hitcracked it my friend
Used to skim on site for years exactly the same method no one would knock a new batch up you would knock enough up for laying onI lay in with same gear which is apparently 1 coat. I don’t agree with that tho.
f**k knows how anyone can actually put 1 coat on board. Tried it a few times too much work
Easy said on a forum, would love to snag your work. Bet it's not as good as you think
And that's exactly how we do it . But we all have different methods and if it dont get snagged well that's ok imo how the pink shite goes onUsed to skim on site for years exactly the same method no one would knock a new batch up you would knock enough up for laying on
Used to skim on site for years exactly the same method no one would knock a new batch up you would knock enough up for laying on
I’m amazed how u do it I know lads say they put on a thicker mix ,but to get it all on plus the amount u do ,in one hit
I'd
Show me a fully dried out picture..after 3 days or sumat..
How long have you been plastering? I'm guessing not longI've seen loads fellas 1 and 2 coat
there shite mate
I've seen loads of fellas 1 and 2 coat
there good mate