Afternoon people, hope all is fine an dandy?
Had a ganders through the forum an must admit this subject has done the rounds few times but been doing some floating last week (hardwall) thought change it up a bit an used horizontal screeds one about head height and one along bottom of wall, from one end to other end of wall plumb then rule in off them. And seem fair bit quicker then other methods have tried.
Usually put screeds vertically either end of wall an float down from top till hit floor.
Have dabbled in the world of free ruling loading wall on an going for it and smaller areas this does the trick.
No right or wrong as long as ya get there in end just wondered peoples preference?
Thanking you please!
Had a ganders through the forum an must admit this subject has done the rounds few times but been doing some floating last week (hardwall) thought change it up a bit an used horizontal screeds one about head height and one along bottom of wall, from one end to other end of wall plumb then rule in off them. And seem fair bit quicker then other methods have tried.
Usually put screeds vertically either end of wall an float down from top till hit floor.
Have dabbled in the world of free ruling loading wall on an going for it and smaller areas this does the trick.
No right or wrong as long as ya get there in end just wondered peoples preference?
Thanking you please!